Nortonville, KY
Nortonville, KY is an 8-stall V3 Tesla Supercharger. Charging peaks at 250 kW. The site is open to non-Tesla EVs. It opened in October 2023. It's one of 20 Tesla Supercharger locations in Kentucky. The nearest alternative Supercharger is Beaver Dam, KY, 36.5 mi away, with 5 more within 58.0 mi.
Operational
8
Stalls
250kW
Peak Power
V3
Generation
Location413 ft elev
162 Hopkinsville Rd, Nortonville, KY, 42442
OpenedOctober 2023
Connectors
NACS
Access Notes
- Open to non-Tesla vehicles
External
Nearby Superchargers
- Beaver Dam, KY36.5 mi · 8 stalls · 250 kW
- Kuttawa, KY - US-6238.1 mi · 8 stalls · 325 kW
- Kuttawa, KY38.1 mi · 8 stalls · 150 kW
- Clarksville, TN42.6 mi · 8 stalls · 325 kW
- Evansville, IN55.9 mi · 12 stalls · 250 kW
- Bowling Green, KY58.0 mi · 8 stalls · 150 kW





